zEnterprise Unified Resource Manager
				Project and Program: 
MVS, 
MVS Core Technologies
				Tags: 
Proceedings, 
SHARE in Anaheim 2011, 
2011
		
		
		
			
		The IBM zEnterprise Unified Resource Manager enables the deployment and  management of the heterogeneous hardware resources of System z ensembles through  a single interface that can be tied to business requirements. This session will  describe the contents of an ensemble and the suites of functionality available  to manage one. A sample use case scenario walk-through will be presented  demonstrating the Unified Resource Manager interface for defining an ensemble  and adding members to it, along with the process for creating a virtual server,  assigning resources to it, and connecting it to the Intra-ensemble Data Network.  An example workload definition and workload-based performance policy definition  will also be covered along with sample menus for enabling available energy  management functions.
Presenter(s): Patty Driever, IBM Corporation
 
		
		
		
		
		
		
	 Back to Proceedings File Library